Refurb Week 8
Quite by fortuitous chance whilst JCS were on the roof wrestling with the flue lining this week, local chimney specialists Tim’s Chimneys got in touch through Facebook wondering if they could lend a hand in any way. The offer was gratefully taken up and they have…
Refurb Week 7
We were delighted that our second volunteer day on 12th July was as well attended as the first with some 30 people giving up their time. Together they sanded, unscrewed, unblocked, filled in and deconstructed all around the building, laying the way open to applying…
Refurb Week 6
The major event this week is that our friends at Dr Heating have, as anticipated, completed the works necessary for the new water main connection to be made They were ably assisted by superstar farmers Ian and Steve (who drove the digger) who between haymaking and harvesting,…
Refurb Week 5
This week there is an update on the filter refurb. Whilst painting it after the old pipework had been removed, it was discovered that the original legs to the vessel had rusted through! Nothing is too much trouble for the GRC Filtration lads, so after a…
Refurb Week 4
No new firms or areas of work to report on this week. The great work already commenced by JCS fabricating the boiler pipework and Aqua Tilers in the pool is continuing. (200 tiles replaced and a few metres of expansion joint removed so far!) The…
Recent Comments
Archives
- November 2026
- October 2026
- September 2026
- August 2026
- July 2026
- June 2026
- May 2026
- February 2026
- November 2025
- September 2025
- August 2025
- June 2025
- April 2025
- March 2025
- February 2025
- December 2024
- November 2024
- October 2024
- September 2024
- August 2024
- July 2024
- June 2024
- May 2024
- April 2024
- March 2024
Categories
- Client story (2)
- Fundraising (24)
- Inspiration (2)
- Newsletter (6)
- Our Story (39)
- Pool Update (35)
- Refurbishment (22)