Refurb Week 20
Things are really “hotting” up this week and with so many trades in the building the end of the refurbishment is drawing ever nearer! With the filters commissioned and the water circulating, JCS are back to commission the boilers and begin the pool water heating…
Refurb Week 19
We were fortunate to be approached by Richard Stevens of local flooring company RCS Flooring Ltd at the Freman College open evening. With the building work complete, he has donated his skill and time to lay a new floor in the kitchen this week which,…
Refurb Week 18
The building work continues this week with the steel beam being installed and the rest of the block work being finished off. Long time friend of the project Bespoke Wizard, Robin was back, this time installing a wonderful new reception desk donated by one of…
Refurb Week 17
Building work was the order of the day this week! Will Brownless joined the team and has begun the process of creating the cafe counter and expanding the foyer for greater viewing. First came the rather surgical removal of the block work separating the foyer from the…
Refurb Week 16
More great progress to mention this week! Internal painting continued with volunteers John and Isobel Massey returning with Ted Waller, working on smartening up the current accessible changing room area. We also began to remove the display cabinet in preparation for builder Will Brownless to start…
Refurb Week 15
This week has been dominated by preparations for the Classic Car Show where we were pleased to host our first open day. Bob and Dunk-an gave the foyer the once over with Jo Ryman and Vicky Fairey, whilst Diane Tuck created the informative displays. Elsewhere,…
Refurb Week 14
September is here and summer is over, as week 14 of the refurb draws to a close. This has been the last week of work on the tiling which is quite a milestone! The channel tiles have been spray painted and the final lengths of…
Refurb Week 13
This week has been all about consolidating what was begun last week on the professional side. The two Pauls, from Aquatilers and H2O, are continuing their work on the tiles and in the plant room. The pool water circuit in the latter was completed by the…
Refurb Week 12
We had another delivery of donated paint this week, thanks to the generosity of Brewers Decorator Centres Ltd. We’ve now got the means to decorate the internal doors and other wood work around the building, stamping our identity onto the place. Paul from Aquatilers is back…
Refurb Week 10
The wonderful, we are calling them the “Limescale Ladies” Vicky Fairey, Diane Tuck and Anna Dousek continued their tireless efforts, begun by Jo and Ben Willis, to eradicate the limescale in both shower rooms this week. The task proved more testing than first thought but after…